Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Careful construction and rigid inspection lower track costs
High standards of track construction, systematic checking of track every year after it is built and immediate repair of any defects, keep Youngstown maintenance costs at minimum; method of using mechanical ties; details of Dayton mechanical tie construction, using mastic paving surface.
Careful construction and rigid inspection lower track costs
High standards of track construction, systematic checking of track every year after it is built and immediate repair of any defects, keep Youngstown maintenance costs at minimum; method of using mechanical ties; details of Dayton mechanical tie construction, using mastic paving surface.
Careful construction and rigid inspection lower track costs
Transit J
Timblin, C. (Autor:in)
Transit Journal ; 76
1932
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Careful design cuts construction costs on Los Angeles freeway structures
Engineering Index Backfile | 1950
|Asbestos removal and inspection needs careful scheduling
Tema Archiv | 1988
|Lightweight concrete for lower construction costs
Engineering Index Backfile | 1951
|Online Contents | 2006
|