Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Birmingham, tame and rea district drainage
New construction and results of operation of plant serving population of 1,133,000; sewage treatment and disposal; sludge gas-plant operation; economy in working; wasteheat recovery plant; prevention of smell nuisance on disposal plants.
Birmingham, tame and rea district drainage
New construction and results of operation of plant serving population of 1,133,000; sewage treatment and disposal; sludge gas-plant operation; economy in working; wasteheat recovery plant; prevention of smell nuisance on disposal plants.
Birmingham, tame and rea district drainage
Surveyor
Surveyor ; 82
1932
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Birmingham, Tame and Rea District drainage board
Engineering Index Backfile | 1930
Primary sludge digestion plant at Minworth works of Birmingham Tame and Rea District drainage board
Engineering Index Backfile | 1962
|Power-gas from sewage-sludge at the works of the Birmingham tame and rea district drainage board
Engineering Index Backfile | 1929
|Designing drainage channels in Birmingham
Engineering Index Backfile | 1932
|Some drainage problems in the Birmingham area
Engineering Index Backfile | 1929
|