Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
With leveling hone and pin planing mixer, road-mix surfaces are constructed with fewer machine operations and less bituminous binder. (see also anonymous description in Eng News-Rec v 109 n 10 Sept 8 1932 p 292-3)
With leveling hone and pin planing mixer, road-mix surfaces are constructed with fewer machine operations and less bituminous binder. (see also anonymous description in Eng News-Rec v 109 n 10 Sept 8 1932 p 292-3)
Ohio builds road-mix job with new tools
Roads Streets
Perry, H.S. (Autor:in)
Roads and Streets ; 75
1932
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Ohio builds road-mix job with new tools
Engineering Index Backfile | 1932
|Ohio builds a road to rock house state park
Engineering Index Backfile | 1931
|Fulton County, Ohio builds low-cost roads
TIBKAT | 1954
|Baltimore and Ohio builds new main line bridge
Engineering Index Backfile | 1920
|Engineering Index Backfile | 1942
|