Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of reservoir, 26 sq mi in surfacearea in headwaters of Shenango River, North of Pittsburgh; for purposes of flood control, water supply, hydroelectric power development, etc, involving construction of rolled earth dam 2400 ft long, 50 ft max height, with steel sheet pile cut-off 40 ft deep; employment of day labor as unemployment-relief measure. (See also - (discussion) p 140-53; Eng News-Rec v 108 n 19 May 12 1932 p 692)
Construction of reservoir, 26 sq mi in surfacearea in headwaters of Shenango River, North of Pittsburgh; for purposes of flood control, water supply, hydroelectric power development, etc, involving construction of rolled earth dam 2400 ft long, 50 ft max height, with steel sheet pile cut-off 40 ft deep; employment of day labor as unemployment-relief measure. (See also - (discussion) p 140-53; Eng News-Rec v 108 n 19 May 12 1932 p 692)
Pymatuning reservoir project
Engrs Soc Western Pa -- Proc
Ryder, C.E. (Autor:in)
1932
38 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1912
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1967
|Judy Reservoir Enlargement Project
British Library Conference Proceedings | 1999
|Engineering Index Backfile | 1940