Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method of construction of lined water-supply reservoir, 5,500,000 gal capacity, covered with vaulted galvanized iron roof, at Quetta, Afghanistan; native labor was used.
Method of construction of lined water-supply reservoir, 5,500,000 gal capacity, covered with vaulted galvanized iron roof, at Quetta, Afghanistan; native labor was used.
Quetta water-supply
Roy Engrs J
Raikes, J.W.J. (Autor:in)
1932
16 pages
5 Supp plates
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|Constructing Roman church at Quetta
Engineering Index Backfile | 1898
Quetta - growing water demand from declining resources
British Library Conference Proceedings | 1998
|Central heating of Quetta military hospitals
Engineering Index Backfile | 1940
|