Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Collection costs in Utica reduced by special equipment
Savings effected by placing in service five Collecto body trucks of 10-yd capacity each; effect of wrapping on collection.
Collection costs in Utica reduced by special equipment
Savings effected by placing in service five Collecto body trucks of 10-yd capacity each; effect of wrapping on collection.
Collection costs in Utica reduced by special equipment
Am City
McKernan, C.A. (Autor:in)
American City ; 47
1932
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The break in the Utica reservoir
Engineering Index Backfile | 1902
Engineering Index Backfile | 1874
|Utica home telephone company's exchange
Engineering Index Backfile | 1903
|ASCE | 2021
|Steel tie and concrete construction on Utica and Mohawk valley railway system, Utica, N. Y.
Engineering Index Backfile | 1907
|