Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel pile bulkhead wall retains deep-water fill
Extension of Lincoln Park in Chicago by use of long steel sheet piles for deep open-lake seawall; seven million-cu yd dredge fill adds 365 acres; dredging and filling for boat harbor; cost of completed park improvement $8,000,000.
Steel pile bulkhead wall retains deep-water fill
Extension of Lincoln Park in Chicago by use of long steel sheet piles for deep open-lake seawall; seven million-cu yd dredge fill adds 365 acres; dredging and filling for boat harbor; cost of completed park improvement $8,000,000.
Steel pile bulkhead wall retains deep-water fill
Eng News-Rec
Engineering News-Record ; 108
1932
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Anchored timber bulkhead supports highway fill
Engineering Index Backfile | 1939
Soil-Pile Coupling Analysis of Steel Sheet Pile Bulkhead under Horizontal Loads
Trans Tech Publications | 2015
|Soil-Pile Coupling Analysis of Steel Sheet Pile Bulkhead under Horizontal Loads
British Library Conference Proceedings | 2015
|Batter-pile tension retains earth walls
Engineering Index Backfile | 1965