Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Electrification of Madras suburban section of South Indian Railway
Development on lines divided into three stages, first of which was provision of one extra track between Madras Beach and Madras Egmore, distance of 2.64 mi, and two extra tracks between Madras Egmore and Tambaram, distance of 15.46 mi, and electrification of double track from Madras Beach to Tambaram for suburban services.
Electrification of Madras suburban section of South Indian Railway
Development on lines divided into three stages, first of which was provision of one extra track between Madras Beach and Madras Egmore, distance of 2.64 mi, and two extra tracks between Madras Egmore and Tambaram, distance of 15.46 mi, and electrification of double track from Madras Beach to Tambaram for suburban services.
Electrification of Madras suburban section of South Indian Railway
Instn Civ Engrs -- Min Proc Paper
White, B.G. (Autor:in)
1932
37 pages
Supp plates
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Suburban electrification on Central Argentine railway
Engineering Index Backfile | 1947
Electrification of the Berlin suburban railway
Engineering Index Backfile | 1929
Great Northern suburban electrification into service
Tema Archiv | 1977
|Strengthening girder bridges on the Madras railway
Engineering Index Backfile | 1907
|Engineering Index Backfile | 1924
|