Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Levee building with tower machine and crawler wagons
Methods used in construction of 7 mi of new levee near Lake Village, Ark, involving handling of 2,800,000 yd at 12.90c per yd.
Levee building with tower machine and crawler wagons
Methods used in construction of 7 mi of new levee near Lake Village, Ark, involving handling of 2,800,000 yd at 12.90c per yd.
Levee building with tower machine and crawler wagons
Contractors Engrs Monthly
1932
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Tower-excavator development for Levee building
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1916
|Engineering Index Backfile | 1902
|Levee building at Lake Okeechobee
Engineering Index Backfile | 1934
Levee building by hydraulic dredge
Engineering Index Backfile | 1929