Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Columbia basin project reported feasible
Irrigation and power development project, between Spokane and Tacoma, contemplating irrigation of 1,200,000 a. and development of 1,575, 000 kw, involving construction of straight concrete dam of gravity section, 420 ft high and 4100 ft long; estimated cost $376, 641,000.
Columbia basin project reported feasible
Irrigation and power development project, between Spokane and Tacoma, contemplating irrigation of 1,200,000 a. and development of 1,575, 000 kw, involving construction of straight concrete dam of gravity section, 420 ft high and 4100 ft long; estimated cost $376, 641,000.
Columbia basin project reported feasible
Eng News-Rec
Walter, R.F. (Autor:in)
Engineering News-Record ; 108
1932
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Columbia basin project reported feasible
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1952
|Engineering Index Backfile | 1936
|Tile drains in Columbia basin project
Engineering Index Backfile | 1966
|Columbia basin -- Nation's greatest irrigation project
Engineering Index Backfile | 1947