Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
May n 5 p 94-96: Concrete aggregates; Arizona gravel deposit; sand washing; screening-plant details. July n 7 p 125-127: Concrete mixing plant; control of aggregate quantities; mixing operations; plant equipment. Aug n 8 p 142-144: Lining of diversion tunnels; lining invert and sidewall sections; pouring concrete in crown sections. (see also Pit and Quarry v 25 n 2 Oct 19 1932 p 16-29; Contractors and Engrs Monthly v 25 n 5 Nov 1932 p 24-7; and Eng and Contracting v 71 n 8 Aug 1932 p 199-200)
May n 5 p 94-96: Concrete aggregates; Arizona gravel deposit; sand washing; screening-plant details. July n 7 p 125-127: Concrete mixing plant; control of aggregate quantities; mixing operations; plant equipment. Aug n 8 p 142-144: Lining of diversion tunnels; lining invert and sidewall sections; pouring concrete in crown sections. (see also Pit and Quarry v 25 n 2 Oct 19 1932 p 16-29; Contractors and Engrs Monthly v 25 n 5 Nov 1932 p 24-7; and Eng and Contracting v 71 n 8 Aug 1932 p 199-200)
Concrete for Hoover dam
Reclamation Era
Nelson, W.R. (Autor:in)
Reclamation Era ; 23
1932
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1932
|Engineering Index Backfile | 1932
|Cableways place hoover dam concrete
Engineering Index Backfile | 1933
|Mass concrete research for hoover dam
Engineering Index Backfile | 1933
|