Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hoover Dam number symposium
Scope of Boulder Canyon Project; Construction Problems at Hoover Dam and How They Are being Handled, W. A. BECHTEL; Hoover Dam Has Outstanding Features of Design and Construction; Progress of Hoover Dam Construction is Year Ahead of Schedule, J. I. BALLARD; Thirty Drills on Truck-Mounted Jumbo Bore 56-Ft. Diversion Tunnels; Feeding Hoover Dam Army; Boulder Project Seen as Great Social Enterprise, H. J. KAISER.
Hoover Dam number symposium
Scope of Boulder Canyon Project; Construction Problems at Hoover Dam and How They Are being Handled, W. A. BECHTEL; Hoover Dam Has Outstanding Features of Design and Construction; Progress of Hoover Dam Construction is Year Ahead of Schedule, J. I. BALLARD; Thirty Drills on Truck-Mounted Jumbo Bore 56-Ft. Diversion Tunnels; Feeding Hoover Dam Army; Boulder Project Seen as Great Social Enterprise, H. J. KAISER.
Hoover Dam number symposium
Construction Methods
Construction Methods ; 14
1932
21 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1930
|Online Contents | 1994
Celebrating Hoover Dam: The Majesty of Hoover Dam
ASCE | 2016
|Online Contents | 2009
|