Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Structure at Charles St, 150 ft long, built without interrupting traffic; reinforcing of old viaduct and use of ingenious structural expendients; viaduct reconstruction plan; new transverse girders were inserted between existing pair, and new longitudinal girders were attached to old girders by diaphragms; cutting down depth of old side girders.
Structure at Charles St, 150 ft long, built without interrupting traffic; reinforcing of old viaduct and use of ingenious structural expendients; viaduct reconstruction plan; new transverse girders were inserted between existing pair, and new longitudinal girders were attached to old girders by diaphragms; cutting down depth of old side girders.
New station added to Boston elevated
Eng News-Rec
Moore, U.E. (Autor:in)
Engineering News-Record ; 108
1932
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
An elevated railway drawbridge in Boston
Engineering Index Backfile | 1900
The south terminal station, Boston, Mass
Engineering Index Backfile | 1900
The south terminal station, Boston, Mass
Engineering Index Backfile | 1899
|The South Terminal Station, Boston, Mass
ASCE | 2021
|