Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Engineers' specifications from contractor's point of view
Non-availability of documents; nature of ground; work in headings; responsibility for engineer's work; surface reinstatements; materials and workmanship; extra work; variations; certificates for payment. (See also - discussion p 361-2)
Engineers' specifications from contractor's point of view
Non-availability of documents; nature of ground; work in headings; responsibility for engineer's work; surface reinstatements; materials and workmanship; extra work; variations; certificates for payment. (See also - discussion p 361-2)
Engineers' specifications from contractor's point of view
Surveyor
Burgess, S.H. (Autor:in)
Surveyor ; 92
1932
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The contractor's view of city contracts and specifications
Engineering Index Backfile | 1911
|The contractor's point of view
British Library Conference Proceedings | 1996
|Concrete arch construction from contractor's view point
Engineering Index Backfile | 1932
|Concrete arch construction from contractor's view point
Engineering Index Backfile | 1932
|British Library Conference Proceedings | 1993
|