Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Belt concreting at Wards Island
On new 180-mgd sewage plant at New York, combination of fixed and portable belt-conveyor units has distributed 108,000 cu yd of concrete over area of 30 a.; heavy wall-form panels moved by special handling rig on truck; handling reinforcing steel; precast concrete work.
Belt concreting at Wards Island
On new 180-mgd sewage plant at New York, combination of fixed and portable belt-conveyor units has distributed 108,000 cu yd of concrete over area of 30 a.; heavy wall-form panels moved by special handling rig on truck; handling reinforcing steel; precast concrete work.
Belt concreting at Wards Island
Eng News-Rec
Engineering News-Record ; 109
1932
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Lock concreting at rock island dam
Engineering Index Backfile | 1934
CONCRETING FACILITY AND CORRESPONDING CONCRETING METHOD
Europäisches Patentamt | 2016
|CONCRETING FACILITY AND CORRESPONDING CONCRETING METHOD
Europäisches Patentamt | 2022
|Concreting facility and corresponding concreting method
Europäisches Patentamt | 2018
|Engineering Index Backfile | 1937
|