Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Arc-welded factory building
First American 100% arc-welded steel-frame building, new $1, 000,000 tank shop, Building No. 14, at Pittsfield, Mass, works of General Electric Co; pilasters covered with plates; all-steel framework erected during subzero weather; crane-girder diaphragm and impost connections to exterior column. (see also Constructor v 14 n 2 Feb 1932 p 29-30)
Arc-welded factory building
First American 100% arc-welded steel-frame building, new $1, 000,000 tank shop, Building No. 14, at Pittsfield, Mass, works of General Electric Co; pilasters covered with plates; all-steel framework erected during subzero weather; crane-girder diaphragm and impost connections to exterior column. (see also Constructor v 14 n 2 Feb 1932 p 29-30)
Arc-welded factory building
Gen Bldg Contractor
1932
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1932
Arc-welded factory building in Canada
Engineering Index Backfile | 1931