Original bridge had length of 1412 ft between abutments; girders made of 30-ton steel, supported on steel trestle piers; plan adopted was to convert each of existing 257-ft spans into pair of continuous girder spans, by establishing new pier under each at midlength; main spans were replaced by new girders 304 ft long between bearings. See also Engineering Index 1931 p 172.
Reconstruction of Attock Bridge over Indus
Original bridge had length of 1412 ft between abutments; girders made of 30-ton steel, supported on steel trestle piers; plan adopted was to convert each of existing 257-ft spans into pair of continuous girder spans, by establishing new pier under each at midlength; main spans were replaced by new girders 304 ft long between bearings. See also Engineering Index 1931 p 172.
Reconstruction of Attock Bridge over Indus
Engineering
Engineering ; 133
1932
3 pages
2 Supp plates
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Well foundations of Kalabagh bridge over Indus
Engineering Index Backfile | 1947
|Extra trusses added to Indus river bridge
Engineering Index Backfile | 1933
|Reconstruction of attock bridge across the river indus on North Western Railway, India
Engineering Index Backfile | 1931
|Salient features of design and construction of new arch bridge over Indus at Sukkur
Engineering Index Backfile | 1962
|Engineering Index Backfile | 1961
|