Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
BPA section of pacific coast intertie traverses variety of terrain
Description of methods adopted by Bonneville Power Administration for construction of 500 kv a-c line of Pacific Northwest-Pacific Southwest intertie; construction of tower footing, tower erection and conductor stringing are considered; good road was built entire length of 180 mi line wide enough to accommodate heavy construction equipment.
BPA section of pacific coast intertie traverses variety of terrain
Description of methods adopted by Bonneville Power Administration for construction of 500 kv a-c line of Pacific Northwest-Pacific Southwest intertie; construction of tower footing, tower erection and conductor stringing are considered; good road was built entire length of 180 mi line wide enough to accommodate heavy construction equipment.
BPA section of pacific coast intertie traverses variety of terrain
Transmission Distribution
Simpson, W.H. (Autor:in)
1967
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Deccan traverses : the making of Bangalore's terrain
TIBKAT | 2006
|Engineering Index Backfile | 1967
|Notes on tachymetric traverses
Engineering Index Backfile | 1933
|