Building Lopez dam
Progress in placing earth fill 160-ft above original stream bed; capacity of reservoir will be 500,000 acre-ft; approximately 3,500, 000 cu yd of fill material will be required to complete embankment; light grout curtain was inserted into foundation to depth of 40 ft, through grout holes at 20-ft intervals; about 100,000 cu yd of rock had to be blasted; nearly 3,500,000 cu yd of fill material for structure will be excavated from pits in future reservoir area and transported by scraper.
Building Lopez dam
Progress in placing earth fill 160-ft above original stream bed; capacity of reservoir will be 500,000 acre-ft; approximately 3,500, 000 cu yd of fill material will be required to complete embankment; light grout curtain was inserted into foundation to depth of 40 ft, through grout holes at 20-ft intervals; about 100,000 cu yd of rock had to be blasted; nearly 3,500,000 cu yd of fill material for structure will be excavated from pits in future reservoir area and transported by scraper.
Building Lopez dam
Western Construction
Western Construction ; 43
1968
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Building Types Study 808 - Reeve Residence, Lopez Island, Wash.
Online Contents | 2002
|Wiley | 1971
|Reeve Residence, Lopez Island, Wash
British Library Online Contents | 2002
|