Gepatsch rockfill dam, 153 m high of Tyrolean Hydroelectric Power Co (Tiwag) was completed in autumn 1964; during first two operational years up to Sept 1966 full reservoir level could be reached after two previous filling periods; through extensive measurements of soil pressure it was ascertained that central dam core transfers part of its weight to bordering transition zones through arching effect; influence of mylonite zone and of grout curtain on seepage flow as well as compression of rock were measured in bedrock; measuring equipment has stood up well; measurements showed that Gepatsch rockfill dam has behaved satisfactorily up to now.
Gepatsch rockfill dam, 153 m high of Tyrolean Hydroelectric Power Co (Tiwag) was completed in autumn 1964; during first two operational years up to Sept 1966 full reservoir level could be reached after two previous filling periods; through extensive measurements of soil pressure it was ascertained that central dam core transfers part of its weight to bordering transition zones through arching effect; influence of mylonite zone and of grout curtain on seepage flow as well as compression of rock were measured in bedrock; measuring equipment has stood up well; measurements showed that Gepatsch rockfill dam has behaved satisfactorily up to now.
Behaviour of Gepatsch rockfill dam
Int Congress on Large Dams
Schober, W. (Autor:in)
9th International Congress on Large Dams ; 1967 ; Turkey , Istanbul
1967
23 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The deformation behaviour of rockfill
UB Braunschweig | 2002
|The deformation behaviour of rockfill
TIBKAT | 2002
|Behaviour of Blasted Rockfill Materials
British Library Conference Proceedings | 2003
|Xingo concrete face rockfill dam behaviour
British Library Conference Proceedings | 2000
|Fundamentals of rockfill time-dependent behaviour
British Library Conference Proceedings | 2002
|