Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Triangulation preparatory to alignment of a tunnel
The article is accompanied by a diagram and profile with full description of method employed in connecting two shafts at Minneapolis by a tunnel for the watersupply. (1000 w.)
Triangulation preparatory to alignment of a tunnel
The article is accompanied by a diagram and profile with full description of method employed in connecting two shafts at Minneapolis by a tunnel for the watersupply. (1000 w.)
Triangulation preparatory to alignment of a tunnel
Jour Assn Eng Soc
Redfield, William W. (Autor:in)
1896
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Shotcrete's Contribution to Gotthard Base Tunnel preparatory Works
British Library Online Contents | 2001
Triangulation of the new cascade tunnel
Engineering Index Backfile | 1927
|Triangulation of the new cascade tunnel
Engineering Index Backfile | 1927
|Online Contents | 1994
Online Contents | 1998