Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Giving a full description of the manner in which the bridge was constructed and launched over a cutting 142 feet wide, containing 11 railway tracks, without interrupting trains. (7500 w.) (1 Trimestre)
Giving a full description of the manner in which the bridge was constructed and launched over a cutting 142 feet wide, containing 11 railway tracks, without interrupting trains. (7500 w.) (1 Trimestre)
The J. F. Lepine bridge
La Pont J. F. Lepine
Biette, L. (Autor:in)
1899
2 Plates
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The J. F. Lepine bridge over the northern railway of France
Engineering Index Backfile | 1897
Bridge over a bridge under a bridge
Engineering Index Backfile | 1957
BRIDGE MONITORING SYSTEM, BRIDGE MONITORING DEVICE, BRIDGE MONITORING METHOD, AND BRIDGE
Europäisches Patentamt | 2019
|