Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Three methods of laying ties on broken stone mixed with sand. The one proposed will cost $1736 per mile of single track road-bed. (1300 w.)
Three methods of laying ties on broken stone mixed with sand. The one proposed will cost $1736 per mile of single track road-bed. (1300 w.)
Electric street railway tracks
St Ry Jour
McCarty, R.J. (Autor:in)
1896
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction and maintenance of electric street railway tracks
Engineering Index Backfile | 1896
|Rehabilitation of street railway tracks
Engineering Index Backfile | 1922
|Pavements between street railway tracks
Engineering Index Backfile | 1899
|Paving along street railway tracks
Engineering Index Backfile | 1927
|Street railway tracks of reinforced concrete
Engineering Index Backfile | 1912
|