Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Experience in organization of work in placing loam lining of Uvod-Volga Canal
Sloped layers of loam required low volumes of auxiliary work and simplified placing of lining; loam was placed at slope of 1 to 15 and used as ramp for dump trucks which facilitated earthwork in winter conditions.
Experience in organization of work in placing loam lining of Uvod-Volga Canal
Sloped layers of loam required low volumes of auxiliary work and simplified placing of lining; loam was placed at slope of 1 to 15 and used as ramp for dump trucks which facilitated earthwork in winter conditions.
Experience in organization of work in placing loam lining of Uvod-Volga Canal
Opyt organizatsii rabot po ustroistvu ekrana iz suglinka na kanale Volga-Uvod
Adamov, V.M. (Autor:in)
1967
3 pages
Aufsatz (Zeitschrift)
Russisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Organization of work of constructing an impervious loam blanket on the Volga-Uvod' canal
Online Contents | 1967
|Organization of work of constructing an impervious loam blanket on the Volga-Uvod' canal
Springer Verlag | 1967
|Machine for placing concrete lining in canal
Engineering Index Backfile | 1916
|British Library Conference Proceedings | 1997
|Engineering Index Backfile | 1953