Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rapid erection of Callender-Hamilton girder to replace weak bridge over irrigation canal; to save time girder was assembled and launched simultaneously; launching nose consisted of top and bottom chord angles of same section as in main girder with equilateral triangles for web panels; assembly of launching nose and installation on bearings.
Rapid erection of Callender-Hamilton girder to replace weak bridge over irrigation canal; to save time girder was assembled and launched simultaneously; launching nose consisted of top and bottom chord angles of same section as in main girder with equilateral triangles for web panels; assembly of launching nose and installation on bearings.
Bridging Nangal-Hydel channel
Ry Gaz
Singh, N. (Autor:in)
Railway Gazette ; 123
1967
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bhakra-Nangal largest dam project in India
Engineering Index Backfile | 1960
|Restoration of a Breach in Mukerian Hydel Channel
British Library Conference Proceedings | 1995
|Economic Change in the Village Nangal Lubana (1956-91)
British Library Conference Proceedings | 1992
|Structural design of hydel power station
Engineering Index Backfile | 1964
|