Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of bridge over Geesthacht canal lock
In order not to interfere with lock operation, 30 m long, 900-ton section of 175 m long 16 m wide prestressed concrete bridge was built on scaffolding 2.37 m over section's final position; after completion, section was lowered by means of system of 12 hydraulic jacks; construction and lowering operations are described in detail.
Construction of bridge over Geesthacht canal lock
In order not to interfere with lock operation, 30 m long, 900-ton section of 175 m long 16 m wide prestressed concrete bridge was built on scaffolding 2.37 m over section's final position; after completion, section was lowered by means of system of 12 hydraulic jacks; construction and lowering operations are described in detail.
Construction of bridge over Geesthacht canal lock
Vom Bau der Schleusenbruecke Geesthacht
Schaefer, H. (Autor:in)
Bauingenieur ; 41
1966
4 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1996
|Construction of canal lock at Newark
Engineering Index Backfile | 1952
Schleuse Geesthacht wird saniert
Online Contents | 1994