Sweden; 700-m long bridge was built with 42-m long double-bascule section for clearance of navigation; bridge rests on steel or concrete pillars carrying load to 26 supports and has width of 16.25 m of which 14 m are roadways; foundation of pillars for bascules was carried out on top of 70-m long tubular steel piles driven down into river clay; piles were injected with cement mortar and pillars were cast in sliding formwork; one viaduct is made in prestressed concrete.
Sweden; 700-m long bridge was built with 42-m long double-bascule section for clearance of navigation; bridge rests on steel or concrete pillars carrying load to 26 supports and has width of 16.25 m of which 14 m are roadways; foundation of pillars for bascules was carried out on top of 70-m long tubular steel piles driven down into river clay; piles were injected with cement mortar and pillars were cast in sliding formwork; one viaduct is made in prestressed concrete.
Bridge over Gota Alv River at Jordfallet
Bro over Gota alv vid Jordfallet
Lysen, L. (Autor:in)
Cement and Betong ; 41
1966
5 pages
Aufsatz (Zeitschrift)
Schwedisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydrology and morphology of Gota Alv River
Engineering Index Backfile | 1963
|Landslide at Surte on River Gota Alv
Engineering Index Backfile | 1955
|Landslide at Intagan on Gota River in 1648
Engineering Index Backfile | 1957
|The landslide at Surte on the Göta River : September 29, 1950
TIBKAT | 1952
|