Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Second longest prestressed span
Notes on construction of Greyfriars Bridge (Hereford), with 290 ft main span in form of prestressed concrete arch, which is believed to be second longest span in United Kingdom; this is constructed integrally with two side spans making total length of 460 ft between abutments; superstructure is formed by five box section beams with connecting slab and diaphragms; cantilever side spans have horizontal soffits at same level as springings of main span.
Second longest prestressed span
Notes on construction of Greyfriars Bridge (Hereford), with 290 ft main span in form of prestressed concrete arch, which is believed to be second longest span in United Kingdom; this is constructed integrally with two side spans making total length of 460 ft between abutments; superstructure is formed by five box section beams with connecting slab and diaphragms; cantilever side spans have horizontal soffits at same level as springings of main span.
Second longest prestressed span
Engineering
Engineering ; 202
1966
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Why Washington, D.C.'s water system has built nation's -- Second longest prestressed span
Engineering Index Backfile | 1961
|Germany's longest prestressed bridge
Engineering Index Backfile | 1960
New Phra Nang Klao Bridge - The Longest Prestressed Concrete Box Girder Span Bridge in Thailand
British Library Conference Proceedings | 2013
|World's longest girder lift span
Engineering Index Backfile | 1950