Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of prestressed pavement at airport in Portugal
Pavement was pretensioned longitudinally and post-tensioned transversely; runway is about 13,100 ft long and 197 ft wide, while taxiway is approximately 10,500 ft long and 98 ft wide; each month about 300 tons of prestressing steel was installed and nearly 7200 cu yd of concrete was placed; project was completed in 38 wk.
Construction of prestressed pavement at airport in Portugal
Pavement was pretensioned longitudinally and post-tensioned transversely; runway is about 13,100 ft long and 197 ft wide, while taxiway is approximately 10,500 ft long and 98 ft wide; each month about 300 tons of prestressing steel was installed and nearly 7200 cu yd of concrete was placed; project was completed in 38 wk.
Construction of prestressed pavement at airport in Portugal
Am Concrete Inst -- J
Mittelmann, G. (Autor:in)
1967
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Prefabricated pavement slab for prestressed concrete airport
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Prestressed Concrete Pavement Construction
NTIS | 1973
|Prestressed Concrete Pavement and Lift-up Methods for construction of Tokyo International Airport
British Library Conference Proceedings | 2002
|Prestressed Concrete Pavement and Lift-up Methods for construction of Tokyo International Airport
British Library Conference Proceedings | 2002
|