Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Project yields by probability method
Simplified statistical method of estimating future yields from reservoirs involves selection of period and runoff record for use in study, use of computers to establish hypothetical runoff sequences and compute-and-plot accumulated deviations from mean, graphical analyses of sequences for safe yields, and statistical treatment of yield values to determine probabilities of occurrence; method was applied to Glen Canyon Reservoir and resulted in 50% probability.
Project yields by probability method
Simplified statistical method of estimating future yields from reservoirs involves selection of period and runoff record for use in study, use of computers to establish hypothetical runoff sequences and compute-and-plot accumulated deviations from mean, graphical analyses of sequences for safe yields, and statistical treatment of yield values to determine probabilities of occurrence; method was applied to Glen Canyon Reservoir and resulted in 50% probability.
Project yields by probability method
ASCE -- Proc (J Hydraulics Div)
Maughan, W.D. (Autor:in) / Kawano, R.Y. (Autor:in)
1963
20 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Project Yields by a Probability Method
ASCE | 2021
|Erratum for “Project Yields by a Probability Method”
ASCE | 2021
|Discussion of “Project Yields by a Probability Method”
ASCE | 2021
|Closure to “Project Yields by a Probability Method”
ASCE | 2021
|Discussion of “Project Yields by a Probability Method”
ASCE | 2021
|