Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cabling and jointing work recently concluded in tunnel; work presented many unusual difficulties due to limited times of access, restricted space; and cold air current necessary for ventilation of tunnel.
Cabling and jointing work recently concluded in tunnel; work presented many unusual difficulties due to limited times of access, restricted space; and cold air current necessary for ventilation of tunnel.
Post office cabling in mersey tunnel
Post Office Elec Engrs' J
Barron, D.A. (Autor:in)
1939
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
Engineering Index Backfile | 1934
Engineering Index Backfile | 1934
Engineering Index Backfile | 1934
Engineering Index Backfile | 1932