Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Recent construction in Ohio of 2.2 mi of pavement using methods and machines heretofore untried; mechanized base construction; vibrating brick into green base concrete. (See also Eng News-Rec v 121 n 22 Dec 1 1938 p 704-6)
Recent construction in Ohio of 2.2 mi of pavement using methods and machines heretofore untried; mechanized base construction; vibrating brick into green base concrete. (See also Eng News-Rec v 121 n 22 Dec 1 1938 p 704-6)
Monolithic brick pavement revival
Construction Methods Equipment
Gamble, V.K. (Autor:in)
1939
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Monolithic brick pavement revival
Engineering Index Backfile | 1938
|Vibrated monolithic brick pavement
Engineering Index Backfile | 1940
|Tests of monolithic brick pavement slabs
Engineering Index Backfile | 1942
|Improved equipment builds monolithic brick pavement
Engineering Index Backfile | 1942
Monolithic brick pavement fails from expansion
Engineering Index Backfile | 1920
|