Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ingenious methods place and drive sheetpile bulkhead in zero clearance
Method of obtaining working clearance for driving sheet piles under new bridge at Belmar, NJ, by use of cable sling through two adjoining Z-piles serving as driving halter for steam hammer in pushing piles down.
Ingenious methods place and drive sheetpile bulkhead in zero clearance
Method of obtaining working clearance for driving sheet piles under new bridge at Belmar, NJ, by use of cable sling through two adjoining Z-piles serving as driving halter for steam hammer in pushing piles down.
Ingenious methods place and drive sheetpile bulkhead in zero clearance
Construction Methods Equipment
Albertson, E.R. (Autor:in)
1939
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Steel sheetpile cells form bulkhead for Long Beach harbor expansion
Engineering Index Backfile | 1950
|NTIS | 1976
|Prestressed sheetpile underpinning
Engineering Index Backfile | 1957
|Prestressed bracing holds sheetpile wall
Engineering Index Backfile | 1949