Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
With base of dam now completed, and with work rapidly progressing on remainder of dam (scheduled for completion in 1942), oxyacetylene process is proving indispensable for fabrication of still another unit of this huge project; 18-ft diam penstocks; details. (See also Welding J (NY) v 18 n 4 Apr 1939 p 225-6)
With base of dam now completed, and with work rapidly progressing on remainder of dam (scheduled for completion in 1942), oxyacetylene process is proving indispensable for fabrication of still another unit of this huge project; 18-ft diam penstocks; details. (See also Welding J (NY) v 18 n 4 Apr 1939 p 225-6)
Flame-shaping grand coulee penstocks
Oxy-Acetylene Tips
Sykes, G. (Autor:in)
Oxy-Acetylene Tips ; 18
1939
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Penstocks for Grand Coulee dam
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1942
Engineering Index Backfile | 1938
Engineering Index Backfile | 1938
Engineering Index Backfile | 1937