Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Island Park dam upper snake river project, Idaho
Construction of earth and rock fill diam, 85 ft max height, crest length 1632 ft; unwatering and cleaning foundation; grouting foundation rock; embankment; clearing reservoir site; hydrostatic pressure indicators.
Construction of Island Park dam upper snake river project, Idaho
Construction of earth and rock fill diam, 85 ft max height, crest length 1632 ft; unwatering and cleaning foundation; grouting foundation rock; embankment; clearing reservoir site; hydrostatic pressure indicators.
Construction of Island Park dam upper snake river project, Idaho
Reclamation Era
Bahmeier, H.F. (Autor:in)
Reclamation Era ; 29
1939
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Upper snake river development [midline ellipsis] construction of island park dam
Engineering Index Backfile | 1938
|Upper snake river development [midline ellipsis] construction of island park dam
Engineering Index Backfile | 1938
|Ice Jam Analysis at Idaho Falls, Snake River, Idaho
NTIS | 1990
|Gold dredging on Snake river in Idaho
Engineering Index Backfile | 1900
|