Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Battery of tall derricks places 250,000 yd of concrete in dam and power house
Methods and equipment used in construction of concrete gravity dam, on New River, at Radford, Va, 98 ft max height, 1150 ft long.
Battery of tall derricks places 250,000 yd of concrete in dam and power house
Methods and equipment used in construction of concrete gravity dam, on New River, at Radford, Va, 98 ft max height, 1150 ft long.
Battery of tall derricks places 250,000 yd of concrete in dam and power house
Construction Methods Equipment
1939
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Steel Derricks for erecting tall buildings
Engineering Index Backfile | 1909
Guy Derricks place concrete for Loyalhanna Dam
Engineering Index Backfile | 1943
Five huge derricks build concrete dam in Italy
Engineering Index Backfile | 1957
|Fixed derricks on towers build high concrete bridge
Engineering Index Backfile | 1935
Derricks do job on Memphis bridge
Engineering Index Backfile | 1949