Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Large core drills aid construction at Chickamauga dam
Use of drills for investigating foundations, and for supplementing and verifying information obtained with small borings; description of methods that were successfully used, under difficult working conditions, to obtain foundation for upper guard wall of Chickamauga, Tenn, navigation lock; equipment and its operation; cost and progress information. (See also - n 8 (discussion) Oct 1939 p 1464)
Large core drills aid construction at Chickamauga dam
Use of drills for investigating foundations, and for supplementing and verifying information obtained with small borings; description of methods that were successfully used, under difficult working conditions, to obtain foundation for upper guard wall of Chickamauga, Tenn, navigation lock; equipment and its operation; cost and progress information. (See also - n 8 (discussion) Oct 1939 p 1464)
Large core drills aid construction at Chickamauga dam
Am Soc Civ Engrs -- Proc
Lewis, Jr., J.S. (Autor:in)
1939
15 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Large core drills aid construction at Chickamauga dam
Engineering Index Backfile | 1940
|Large Core Drills Aid Construction at Chickamauga Dam
ASCE | 2021
|Large core drills aid construction at Chickamauga dam
Engineering Index Backfile | 1940
|Closure to “Lewis on Core Drills at Chickamauga Dam”
ASCE | 2021
|Discussion of “Newsom on Core Drills at Chickamauga Dam”
ASCE | 2021
|