Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Description of concrete gravity dam, 550 m long, 50 m max height, across Dunajec River at Roznow, Poland, in course of construction
Features of adjoining 50,000-kw hydroelectric power plant; construction methods.
Description of concrete gravity dam, 550 m long, 50 m max height, across Dunajec River at Roznow, Poland, in course of construction
Features of adjoining 50,000-kw hydroelectric power plant; construction methods.
Description of concrete gravity dam, 550 m long, 50 m max height, across Dunajec River at Roznow, Poland, in course of construction
La Construction d'un Grand Barrage en Pologne, a Roznow
Deschamps, P. (Autor:in)
1939
8 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 1994
|Flood-season construction method for concrete gravity dam in mountainous river course
Europäisches Patentamt | 2020
|Concrete gravity dam across Vesdre River at Eupen, Belgium
Engineering Index Backfile | 1940
|