Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Queens anchorage of Bronx-Whitestone suspension bridge across East River, New York City; use of special crane, with boom length varying from 85 ft to 120 ft, for hoisting and placing 24,000 cu yd of concrete in 19 24-hr days; operating cycle of crane.
Construction of Queens anchorage of Bronx-Whitestone suspension bridge across East River, New York City; use of special crane, with boom length varying from 85 ft to 120 ft, for hoisting and placing 24,000 cu yd of concrete in 19 24-hr days; operating cycle of crane.
Long-boom crane
Construction Methods Equipment
Hunt, H.W. (Autor:in)
1939
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956