Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Features of temporary bridge of wooden construction. (See also - n 30 July 14 1939 p 424-7)
Features of temporary bridge of wooden construction. (See also - n 30 July 14 1939 p 424-7)
Design and construction of new combined highway and railroad bridge over Rhine River near Konstanz, Germany, consisting of 3 flat arch spans totaling 128 m in length
Der Umbau der Rheinbruecke in Konstanz
Lutz, T. (Autor:in)
Bautechnik ; 17
1939
5 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|