Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dam builders quarry and place 125,000 Yd of Rock per Month
Quarrying operations and methods of construction of Salt Springs rock-fill dam on Mokelumne River in California, being built by Pacific Gas and Electric Co.; spillway excavation amounting to 500,000 yd.; 4 yd. electric shovels used; upstream slope is faced with reinforced-concrete slabs.
Dam builders quarry and place 125,000 Yd of Rock per Month
Quarrying operations and methods of construction of Salt Springs rock-fill dam on Mokelumne River in California, being built by Pacific Gas and Electric Co.; spillway excavation amounting to 500,000 yd.; 4 yd. electric shovels used; upstream slope is faced with reinforced-concrete slabs.
Dam builders quarry and place 125,000 Yd of Rock per Month
Construction Methods
Construction Methods ; 12
1930
4 pages
10 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concreting a 125,000 ton rock storage bin in winter
Engineering Index Backfile | 1929
Design and construction of a 125,000-ton rock storage bin
Engineering Index Backfile | 1930
Mr. Clean AutoDry raises $125,000 for kids' charity
British Library Online Contents | 2004
General street traffic plan for city of Osnabrueck with 125,000 inhabitants
Engineering Index Backfile | 1956
|Engineering Index Backfile | 1928