Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of highest hydraulic fill dam in world; massive bodies of rock at each toe, giving stability; how tunnels were driven and loaded; tunnel shooting. (see also Explosives Engr., vol. 8, no. 5, May 1930, pp. 169-172, 8 figs)
Construction of highest hydraulic fill dam in world; massive bodies of rock at each toe, giving stability; how tunnels were driven and loaded; tunnel shooting. (see also Explosives Engr., vol. 8, no. 5, May 1930, pp. 169-172, 8 figs)
Tunnel blasting at cobble mountain
Eng. Soc. Boston -- Jl
Hatch, H.H. (Autor:in)
1930
11 pages
8 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Tunnel blasting at cobble mountain
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1934
|Tunnel driving at cobble mountain
Engineering Index Backfile | 1931
|Tunnel grouting at Cobble Mountain
Engineering Index Backfile | 1932
|Construction of Cobble Mountain diversion tunnel
Engineering Index Backfile | 1933
|