Electric control for 1300-ft. Cableway at Owyhee dam
Cableway, having head tower weighing 240 tons, moves on five rail tracks laid to circular arc 550 ft. long; tail tower is stationary; hoist drum, 54 in. diam.; concrete is deposited from 8-yd. bucket from cableway into foundation for dam; cableway operator's cab is suspended by 500-ft. wire cable along canyon side.
Electric control for 1300-ft. Cableway at Owyhee dam
Cableway, having head tower weighing 240 tons, moves on five rail tracks laid to circular arc 550 ft. long; tail tower is stationary; hoist drum, 54 in. diam.; concrete is deposited from 8-yd. bucket from cableway into foundation for dam; cableway operator's cab is suspended by 500-ft. wire cable along canyon side.
Electric control for 1300-ft. Cableway at Owyhee dam
Construction Methods
Emerson, R.F. (Autor:in)
Construction Methods ; 12
1930
2 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Heavy-load cableway installation for Owyhee dam
Engineering Index Backfile | 1930
Cableway bucket concretes owyhee dam at rate of 1000 cu
Engineering Index Backfile | 1931
Cableway bucket concretes owyhee dam at rate of 1000 cu. Yd. per Shift
Engineering Index Backfile | 1931
Engineering Index Backfile | 1928
Owyhee irrigation project, Oregon-Idaho
Engineering Index Backfile | 1931
|