Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete plant completely inclosed on winter project
Construction of 11-story apartment building in Milwaukee; use of steam boiler to heat water for concrete mixing and temporary structure to enclose entire concreting plant.
Concrete plant completely inclosed on winter project
Construction of 11-story apartment building in Milwaukee; use of steam boiler to heat water for concrete mixing and temporary structure to enclose entire concreting plant.
Concrete plant completely inclosed on winter project
Am. Contractor
1930
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Inclosed prepayment cars for Baltimore
Engineering Index Backfile | 1915
Investigation of cartridge-inclosed fuses
Engineering Index Backfile | 1916
Towards completely recyclable concrete
TIBKAT | 1996
|Towards completely recyclable concrete
British Library Conference Proceedings | 1996
|Deep substructure of Assay office built in Quicksand by Caisson-inclosed method
Engineering Index Backfile | 1920
|