Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Timber falsework used to erect suspension bridge towers
Notes on erection of steel towers for St. Johns suspension bridge over Willamette River, at Portland, Ore., by use of derricks resting on tall timber falsework; each falsework tower resting on 56 piles, 100 ft. long, was erected by means of guy derrick acting in form of creeper traveler inside frame; wood bents were assembled on ground in 40-ft. sections and lifted into position by guy derrick.
Timber falsework used to erect suspension bridge towers
Notes on erection of steel towers for St. Johns suspension bridge over Willamette River, at Portland, Ore., by use of derricks resting on tall timber falsework; each falsework tower resting on 56 piles, 100 ft. long, was erected by means of guy derrick acting in form of creeper traveler inside frame; wood bents were assembled on ground in 40-ft. sections and lifted into position by guy derrick.
Timber falsework used to erect suspension bridge towers
Eng. News-Rec
Engineering News-Record ; 105
1930
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Multiple arch concrete bridge built on timber falsework
Engineering Index Backfile | 1933
|Falsework challenge of Swedish suspension bridge
British Library Online Contents | 2000
|Engineering Index Backfile | 1938
Engineering Index Backfile | 1938
Effects of Pull-Over on Timber Bridge Falsework Piles
NTIS | 1987
|