Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Erection methods on Alton-St. Louis bridges; Mississippi River structure is 3700 ft. long; Missouri River crossing is 2100 ft. long; end panels floated into place; revisions required in Missouri spans; cantilever erection procedure; all spans adjusted.
Erection methods on Alton-St. Louis bridges; Mississippi River structure is 3700 ft. long; Missouri River crossing is 2100 ft. long; end panels floated into place; revisions required in Missouri spans; cantilever erection procedure; all spans adjusted.
A successful highway toll-bridge project
Civil Eng. (N. Y.)
Pitney, M. (Autor:in)
1930
3 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Highway bridge and tunnel toll rate schedules
Engineering Index Backfile | 1960
|Toll bridge influence on highway traffic operation
Engineering Index Backfile | 1947
|Engineering Index Backfile | 1957
|Highway lighting installation for San Francisco bay toll bridge
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1958