Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Newcastle-Gateshead new road bridge
Outline of bridge and its approaches and other particulars accompanying series of drawings of various parts of structure crossing Tyne River; arch of mild steel, is of two-hinged type; it consists of two crescent-shaped ribs arranged at 45 ft. centers; arch ribs were built out simultaneously from all four hinges; foundations for abutments were taken down to solid rock; continuous girder spans were launched into position by rolling out from earth approaches. (partly on supp. plates)
Newcastle-Gateshead new road bridge
Outline of bridge and its approaches and other particulars accompanying series of drawings of various parts of structure crossing Tyne River; arch of mild steel, is of two-hinged type; it consists of two crescent-shaped ribs arranged at 45 ft. centers; arch ribs were built out simultaneously from all four hinges; foundations for abutments were taken down to solid rock; continuous girder spans were launched into position by rolling out from earth approaches. (partly on supp. plates)
Newcastle-Gateshead new road bridge
Engineer
Engineer ; 149
1930
2 pages
13 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
Engineering Index Backfile | 1928
Engineering Index Backfile | 1927
Engineering Index Backfile | 1928
Verdraaid! - Gateshead Millennium Bridge, Newcastle (Engeland)
Online Contents | 2002