Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Adjustments for temperature, camber, and deflection, and procedure for setting out during erection of the steel arch bridge across the reond nullah at mile 59.25 on the kangra valley railway, India
Adjusting 180-ft. span of three-pin spandrel braced arch designed to carry single meter-gage track.
Adjustments for temperature, camber, and deflection, and procedure for setting out during erection of the steel arch bridge across the reond nullah at mile 59.25 on the kangra valley railway, India
Adjusting 180-ft. span of three-pin spandrel braced arch designed to carry single meter-gage track.
Adjustments for temperature, camber, and deflection, and procedure for setting out during erection of the steel arch bridge across the reond nullah at mile 59.25 on the kangra valley railway, India
Instn. Civil Engrs. -- Selected Eng. Papers
Gelson, W.E. (Autor:in)
1929
8 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Camber adjustments made in the erection of the Quebec bridge
Engineering Index Backfile | 1906
Method for setting pre-camber of deck type railway steel truss arch bridge
Europäisches Patentamt | 2020
|Water Quality of Kangra Valley (India) - A Case Study
British Library Conference Proceedings | 1998
|IBC 23-77: Gantry Erection Procedure of the Mile Long Bridge
TIBKAT | 2023
|Erection of Hurricane Gulch arch bridge on Alaska government railway
Engineering Index Backfile | 1922