Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
An interesting bridge reconstruction on the G. W. R.
Old structure replaced by double-line bridge in 42 working hours; St. Austell station; three main girders vary in length from 82 to 92 ft., and weigh from 21 tons to 30 tons.
An interesting bridge reconstruction on the G. W. R.
Old structure replaced by double-line bridge in 42 working hours; St. Austell station; three main girders vary in length from 82 to 92 ft., and weigh from 21 tons to 30 tons.
An interesting bridge reconstruction on the G. W. R.
Ry. Gaz
Whitley, H.S.B. (Autor:in)
Railway Gazette ; 52
1930
2 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1900
An interesting method of bridge renewal
Engineering Index Backfile | 1913
Kummer bridge -- Interesting continuous box system
Engineering Index Backfile | 1960
|Interesting Wharf construction at Tower Bridge
Engineering Index Backfile | 1931
Richmond completes interesting program of bridge construction
Engineering Index Backfile | 1935