Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The $7,500,000 Mississippi river bridge project at Vicksburg, Miss
Construction of concrete bridge pier; unusual speed in sinking pneumatic caissons to record depth of 123 ft. 6 in. in 53 1/4 lb. of air; correcting 23 ft. list, caused by scour, under 40 ft. by 92 ft. caisson in 70 ft. of water.
The $7,500,000 Mississippi river bridge project at Vicksburg, Miss
Construction of concrete bridge pier; unusual speed in sinking pneumatic caissons to record depth of 123 ft. 6 in. in 53 1/4 lb. of air; correcting 23 ft. list, caused by scour, under 40 ft. by 92 ft. caisson in 70 ft. of water.
The $7,500,000 Mississippi river bridge project at Vicksburg, Miss
Eng. Contracting
Hand, O.J. (Autor:in)
1930
6 pages
8 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
La regularisation du Bas Mississippi. Le laboratoire d'Hydraulique experimentale de Vicksburg
Engineering Index Backfile | 1937
|La regularisation du Bas Mississippi. Le laboratoire d'Hydraulique experimentale de Vicksburg
Engineering Index Backfile | 1937
|